nexvra estimate --interactive

Project estimator

Calibrated against our actual delivery data, not a lead-capture toy. Pick what you need and the range updates live — no email required, nothing gated. For a well-defined project the final scoped price usually lands inside it.

01 — what are we building?
02 — which capabilities?
03 — how complex is the context?
04 — timeline
estimate
base
capabilities
complexity
timeline
$0
estimated range
— weeks

Indicative only. Produced without seeing your system, so it carries a ±20% band. The mapping phase is what turns this into a fixed number — which can move either way.

send_this_brief
01

What moves the number

Integration surface and unknowns, almost always. A greenfield service with two endpoints is cheap. The same service talking to a fifteen-year-old ERP is not.

02

What does not

Design polish, page count, and framework choice barely move engineering cost. Teams routinely over-index on these and under-index on data migration.

03

If it looks too high

Tell us the budget. We will say honestly whether a reduced scope still delivers something worth shipping, or whether you should wait.

Turn the estimate into a real number.

The mapping phase reads your actual system and converts this range into a fixed price you can sign against. It takes three to five days.